CavLab Home

Category

Energy & Retrofit

17 articles

The Distance Premium: A Fortnight of Power Quality at a Rural Supply Extremity

The Distance Premium: A Fortnight of Power Quality at a Rural Supply Extremity

A calibrated power-quality analyser spent two weeks at a farmstead near the end of a long rural spur, logging voltage, phase unbalance and flicker as heat pumps, EV charging and workshop loads overlapped. The results sit awkwardly between statutory limits, design guidance and the practical behaviour of modern appliances.

Moisture Accounting: Three Dehumidifiers in a Cold British Room

Moisture Accounting: Three Dehumidifiers in a Cold British Room

Manufacturers rate dehumidifiers at 30°C and 80% relative humidity; a damp Victorian room in November is rarely either. We logged three domestic units through six weeks of 12–16°C weather to see what the litre claims become in practice — and what they cost to run.

Ten Seconds Behind: What Three Smart Meter Displays Leave Out of the Numbers

Ten Seconds Behind: What Three Smart Meter Displays Leave Out of the Numbers

Three SMETS2 in-home displays were run for eight weeks against a calibrated reference logger, through PV export, overnight standby and the usual domestic clutter of loads. The screens were rarely wrong in the way a meter can be wrong — but they were frequently late, coarsely rounded and occasionally silent about the fact that they had stopped updating.

The Arithmetic Between Two CTs: Four Weeks of a 5 kWh Battery in a Cold Hallway

The Arithmetic Between Two CTs: Four Weeks of a 5 kWh Battery in a Cold Hallway

Two calibrated current transformers, a SMETS2 meter and four weeks of grey West Yorkshire weather: what a 5 kWh AC-coupled battery actually returned, where the losses went, and why the figure on the datasheet is not the figure your bill sees. A measured audit of round-trip efficiency, standby draw and time-of-use arbitrage.

The Metronome Under the Floorboards: A Year of Listening to the Mains

The Metronome Under the Floorboards: A Year of Listening to the Mains

A calibrated mains-frequency logger spent twelve months plugged into a British ring main, counting cycles and recording the grid's smallest deviations. The result is a portrait of a system that is tightly controlled, quietly active and more variable in its physics than its headlines suggest.